Overview of Construction and Installation Technology for Ventilation and Air Conditioning Engineering in Cleanrooms
As a type of building with extremely high indoor environmental requirements, the construction and installation quality of the ventilation and air conditioning system in a cleanroom directly affects the cleanliness, temperature and humidity control, and comfort of employees in the internal environment of the factory. It plays a crucial role in the production activities related to clean rooms.
Therefore, the importance of the construction and installation process of ventilation and air conditioning in clean rooms is self-evident. This article will discuss in detail the preparation before construction, design and material selection of ventilation and air conditioning systems, construction process flow, quality control, etc., in order to provide useful references for related projects.
Preparation before construction
Technical preparation: Before construction, a detailed design analysis of the ventilation and air conditioning system in the clean room should be conducted to determine the layout and equipment selection of the supply, exhaust, cooling, heating, and other systems. At the same time, prepare detailed construction plans and operation manuals, clarify the construction sequence, quality requirements, and safety measures.
Material and equipment preparation: According to the design requirements, prepare the materials and equipment required for the ventilation and air conditioning system, such as fans, air conditioning units, ducts, insulation materials, etc. Ensure that materials and equipment have sufficient performance and quality, meet design requirements and relevant standards.
On site preparation: Clean and organize the construction site to ensure a clean and orderly construction environment. Build temporary facilities, such as construction platforms, lighting equipment, etc., to provide convenient conditions for construction.
Please first Loginlater ~